Double ramrig operations


Main Rig:
  • Drilling entire well
  • Running of BOP and Riser
  • Wire line
  • Coiled tubing
Auxiliary Rig:
  • Build and rack stands of Drill pipe and Casing strings
  • Running BOP and Riser
  • Drilling top hole, no return
  • Run 30” and 20” Casing strings
  • Run X-mas trees
RamRig Principles
  • No derrick - only guiding frame
  • No traditional compensating equipment
  • No drawworks
  • No crown and travelling blocks
  • No drilline
  • No electro-magnetic brake
  • Hoisting and compensation by use of the “rams” and a closed loop hydraulic system