Aker H-6e Winterization


INCLUDED IN DESIGN FROM DAY ONE
  • Normally manned working areas kept indoors
  • Piping and cable routing kept indoors
  • Maximum use of the double bottom
  • Weather protected maintenance and inspection areas
  • Weather protecting cladding of Ram Rig and moon pool area
  • Heat tracing of critical equipment and systems, escape routes, safety equipment, muster areas
  • Heating units on drill floor and moon pool
  • Steam service outlets for de-icing
  • Heating medium system for frost protection
  • Protection of Electro, Instrumentation & Telecommunication equipment
  • Insulation of rooms and compartments

You need to have Flash Player installed to view this content/ Du må ha installert Flash Player for å se dette innholdet.
Download Flash Player for free here